How to reboot the Cyclic IMS instrument - WKB96680
Article number: 96680
OBJECTIVE or GOAL
Reboot the Cyclic IMS instrument.
ENVIRONMENT
- SELECT SERIES Cyclic IMS
- MassLynx SCN 1016 RC1 and higher
PROCEDURE
- Close MassLynx. This stops the Typhoon gate control.
- If using an LC system, start the “stop processes” bat file from the C:\MassLynx\bin folder.
- On the back instrument panel, flip the "pump override" switch to the "override" position.
- Turn the electronics breaker off and wait 30 seconds.
- Turn electronics on and wait about four minutes. The rebooted embedded PC is indicated by a solid white LED ribbon or by "ping epc -t" in the command line.
- Start MassLynx.
ADDITIONAL INFORMATION
Before starting further acquisitions, turn on the Tune page, refill fluidics, start infusion, and press Tune to observe the beam. When using an LC-MS setup, ensure that all configured LC modules are turned on. To gain full communication, it may be useful to press "Tools" > "Reset Communications" in the inlet method editor.
id96680, comms, CYCIMS, SCN1016