How to start an ACQUITY UPLC system after long-term storage - WKB97158
Article number: 97158
OBJECTIVE or GOAL
To start an ACQUITY system after long-term storage.
ENVIRONMENT
ACQUITY UPLC
PROCEDURE
Video below
- Plug in all electrical connections.
- Power-on PC.
- Power-on instruments, starting with the ACQUITY Sample Manager.
- Establish communications.
- Put all solvent lines in 100% water.
- Prime the BSM seal wash.
- Prime the BSM A and B pumps.
- Prime SM wash and sample syringes.
- Bypass column with a union.
- Flush the system with 100% water.
- Make up new solvents for running samples.
- Prime the BSM seal wash.
- Prime the BSM A and B pumps.
- Prime the SM wash and sample syringes with new solvents.
- Install the column.
- Disconnect the flow cell or MS.
- Flush the system with 50/50 A/B organic/water.
- Connect the flow cell or MS.
ADDITIONAL INFORMATION
id97158, comms, UPBINARY