Skip to main content
Waters

How to start an ACQUITY UPLC system after long-term storage - WKB97158

Article number: 97158

OBJECTIVE or GOAL

To start an ACQUITY system after long-term storage.

ENVIRONMENT

ACQUITY UPLC

PROCEDURE

Video below

  1. Plug in all electrical connections.
  2. Power-on PC.
  3. Power-on instruments, starting with the ACQUITY Sample Manager.
  4. Establish communications.
  5. Put all solvent lines in 100% water.
  6. Prime the BSM seal wash.
  7. Prime the BSM A and B pumps.
  8. Prime SM wash and sample syringes.
  9. Bypass column with a union.
  10. Flush the system with 100% water.
  11. Make up new solvents for running samples.
  12. Prime the BSM seal wash.
  13. Prime the BSM A and B pumps.
  14. Prime the SM wash and sample syringes with new solvents.
  15. Install the column.
  16. Disconnect the flow cell or MS.
  17. Flush the system with 50/50 A/B organic/water.
  18. Connect the flow cell or MS.

ADDITIONAL INFORMATION

 

id97158, comms, UPBINARY

Not able to find a solution? Click here to request help.