Skip to main content
Waters

ACQUITY H-Class SM-FTN Maintain Test Procedures - WKB5971

Article number: 5971

OBJECTIVE or GOAL

Confirm Sample Manager (SM-FTN) status.

ENVIRONMENT

  • ACQUITY UPLC H-Class Sample Manager with Flow-Through Needle

PROCEDURE

  1. Characterize Needle Seal:

    1.1 In the console, go to SM-FTN > Maintain > Characterize needle seal and click Start.clipboard_e929a75fe54d50c4f89bb76e95f9893f8

  2.  Leak test:
    2.1 In the console, go to SM-FTN > Maintain > Leak test and select Start.clipboard_e217ae8b5eeff2037a155ed24843d7ac4
    3. Needle Seal Readiness Test:
    3.1 Establish an appropriate pump flow and pressure.

         3.2 In the console, go to SM-FTN > Maintain > Needle seal readiness test and select Start.

    clipboard_e3cc37b9065d660f2a49dccfdc421c8a2 
    4. System leak test. 

         4.1 In the console, go to QSM > Maintain > Leak Test.

    4.2 Select an appropriate channel (A, B, C or D) with organic solvent.

         4.3 As end point select column, include Sample Manager Needle and Seal.

         4.4 Install a pin plug in port 6 of the Sample Manager POD Injector.

    clipboard_e33e3e1a0b58542f1198a7c835438b263

        4.5 Click Start.

        clipboard_e23fe76959795142af055c92dcc2f97cb

       
     

ADDITIONAL INFORMATION

Overview and Maintenance guide

id5971, UPQSM, UPQSM+, UPQSMBIO, UPQSMBIO+, UPSMFTN, UPSMFTN+, UPSMFTNB+, UPSMFTNBIO

Not able to find a solution? Click here to request help.