Skip to main content
Waters

What is required following an HPLC/UPLC relocation in a lab? - WKB252008

Article number: 252008

ENVIRONMENT

  • UPLC
  • HPLC

ANSWER

Relocation of a system within the same lab (whether disconnected/reassembled or kept connected as a system) requires re-qualification if a customer specifies it within their own SOPs. A system suitability test or standard injection of a customer method is recommended to determine system performance following a relocation.

ADDITIONAL INFORMATION

 

Not able to find a solution? Click here to request help.