Skip to main content
Waters

How to disassemble an Alliance 2695 - WKB191844

Article number: 191844

OBJECTIVE or GOAL

Shut down and disassemble an Alliance 2695 for shipment to the repair center.

ENVIRONMENT

  • Alliance 2695
  • Alliance e2695
  • Alliance 2795

PROCEDURE

  1. Wash the system with H2O for 20 minutes, and then wash the system with IPA for 20 minutes.
  2. Remove the sample carousels from the sample manager and remove the solvent filters from the solvent bottle and place them in a plastic bag (as shown below).
    clipboard_e766b7b99d291363345c63deae1cb741d.png
  3. Close the control software and power-off.
  4. Electrically unplug the 2695 and mark and remove any cables (Ethernet, signal, I/O, events).
    (Marking the cables is important for reinstalling the system when the modules come back from repair. Photos of the cable and tubing are also helpful.)
    clipboard_e6adb4518ae89244a42192b2d1cf898df.png
  5. Remove the Column Heater (if present).
  6. Remove the detector from the top (if present).
  7. Remove the solvent reservoirs.
  8. Remove the waste tubes from the waste bottle and insert them in a plastic bag.
  9. Move the module to a suitable box for shipment. (If a box is not available, ask your local Waters office.)
    Note the dimensions and weight of the module to choose the appropriate box:
    Alliance 2695 58.4 cm X 64.8 cm X 57.2 cm, 61.7 kg
  10. Fill and sign the latest revision of the H&S module provided by Waters.
  11. Attach it to the box and send a PDF copy to the local Waters office.

  12. The Waters office will contact you to arrange the shipment.

ADDITIONAL INFORMATION

To reinstall the module, attach all of the cables and tubes that were removed.

id191844, 2690, 2690D, 2690DUPGD, 2690UP, 2695, 2695D, 2695DE, 2695DEB, 2695DUP, 2695E, 2695EB, 2695INERT, 2695UP, 2790XE, 2790XEUP, 2795E, 2795UP, 2795XE, A-10SSM, ALLCOLCLR, ALLCOLHTR, ALLCOLHTRB, isopropanol

Not able to find a solution? Click here to request help.