Skip to main content
Waters

How to disassemble a 2489 HPLC UV Detector - WKB191850

Article number: 191850

OBJECTIVE or GOAL

Shut down and disassemble a 2489 HPLC UV Detector for shipment to the repair center.

ENVIRONMENT

  • 2489 UV/Vis Detector

PROCEDURE

  1. Wash the system with H2O for 20 minutes, and then wash the system with IPA for 20 minutes.
  2. Close the control software and power-off the module.
  3. Electrically unplug the module and mark and remove any cables (Ethernet, signal, I/O, events) from the module.
    (Marking the cables is important for reinstalling the system when the modules come back from repair. Photos of cable and tubing are also helpful.)

    clipboard_ec745abb9008501c9648a893a35c14c92.png
     
  4. Disconnect inlet and outlet tubing from the flow cell.
  5. Move the module to a suitable box for shipment. (If a box is not available, ask your local Waters office.)
    Note the dimensions and weight of the module to choose the appropriate box:
    2489 HPLC UV Detector 20.8 cm X 34.3 cm X 61.0 cm, 13.8 kg
  6. Fill and sign the latest revision of the H&S module provided by Waters.
  7. Attach it to the box and send a PDF copy to the local Waters office.

  8. The Waters office will contact you to arrange the shipment.

ADDITIONAL INFORMATION

To reinstall the module, attach all of the cables and tubes that were removed.

id191850, 2489, 2489B, 2489SFC, A-10UV, isopropanol

Not able to find a solution? Click here to request help.

  • Was this article helpful?