How to do a full electronics (EPC) reboot on a Xevo QTof / Vion - WKB101633
Article number: 101633
OBJECTIVE or GOAL
Do an electronics (EPC) reboot on a Xevo QTof or Vion
ENVIRONMENT
- Xevo QTof
- Vion
- UNIFI
- waters_connect
- MassLynx
PROCEDURE
Monitor using Hyperterminal (optional).
- Close Tune Page
- On the back of the MS, set the top switch (pump override) down (override on).
- Set the lower switch down (electronics off).
- Wait 60 seconds (to allow boards to fully dissipate).
- Set the lower switch up (electronics on).
- Wait five minutes and then check the system in MassLynx/UNIFI.
- If MS is not responding in UNIFI, take system offline and do a reset of the LND/workstation in Device Management.
- Bring system back online in Device Management. If EPC failure error is seen, reboot MS a second time to clear error.
- Once communications are re-established, on the back of the MS, set the top switch (pump override) up (override off).
ADDITIONAL INFORMATION
id101633, comms, PuTTY, XEVOQTOF