Processing method picks up lots of peaks in Empower - WKB99966
Article number: 99966
SYMPTOMS
- Processing method picks up lots of peaks in Empower
ENVIRONMENT
- Empower 3
CAUSE
The processing method integration parameters are not set properly.
FIX or WORKAROUND
- Add a function Inhibit Integration with the time range in which you don't want to integrate.
- Refine the processing method with higher threshold and peak width.
ADDITIONAL INFORMATION
Note: unwanted peaks or large number of peaks on a chromatogram may leads to a slow performance or cause trouble to review and process sometimes.hence design the processing method as per your exact requirement.
