Does the Alter Sample screen show the run time and the next injection delay for Empower 3? - WKB7522
Article number: 7522
ENVIRONMENT
- Empower 3
- Empower 2
- Empower
ANSWER
No. Run Time and Next Injection Delay are not shown in the Alter Sample window. There is an Enhancement Request (PCS 55565) to add this to a future version.
ADDITIONAL INFORMATION
Run Time and Next Injection Delay can be added to a report using the Sample Set Method Group.

