SYMPTOMS

  • Unable to see Gas Sampling Valve option in the event section of the instrument method

ENVIRONMENT

  • ICF 3.6
  • ICF 3.5.1
  • Empower 3

CAUSE

The option is unavailable. 

FIX or WORKAROUND

Use the valve tab option instead of the event tab.
Take the following steps to use the Gas Sampling Valve.

clipboard_e2a796120e26dfa3b99af3d3d005aa71a.png

1. Switch on GC.

2. From the GC front panel in a configuration, select valve 1 as GSV.

3. Scan GC from the Agilent PreConfig utility.

4. Create a new instrument method.

5. On the Option tab of the instrument method, select injector preference as GSV or Valve 1.

clipboard_e886472f5835ee364820063b353d15ea3.png

6. In Configuration > Miscellaneous > Valve configuration, select Valve type as Gas Sampling Valve.

clipboard_e2456b3faed33c9c88f4d3d965dbf307b.png

7. In the Valve section of the instrument method, select valve = valve #1, Type = Gas Sampling Valve, Load time = as per requirement, and inject time = as per requirement.

clipboard_e58c040445085e8c56ba869896414e607.png


 

ADDITIONAL INFORMATION

In Load position, an external gas or liquid stream flows through a sampling loop and out to waste.

In Inject position, the filled sampling loop is inserted into the carrier gas stream.

Load time: amount of time (in minutes) the Valve should remain in its load position before switching to the inject position.

Inject time: amount of time (in minutes) the valve should remain in its inject position before returning to the load position.