Skip to main content
Waters

Empower 3 PDA: How to create a report that overlays the three spectra of peak start, end, and apex? - WKB124629

Article number: 124629

OBJECTIVE or GOAL

  • Creating a report that overlays the spectra of the peak start, end, and apex

ENVIRONMENT

  • Empower 3

PROCEDURE

1. On the Report Method Editor window, from the PDA/MS group in the report group tree on the left side, double click "Spectrum Index" to add to the report page on the right


2. Right-click on the spectrum index to open the spectrum index properties

3. On the Spectrum Index tab, tick the spectrum type "Peak Offsets" and enter 100%.

* By the above procedures, the three spectra of peak apex, start point, and end point are overlaid.
* If you enter 50% in "Peak Offsets", the spectrum at the midpoint between the start/end point and the apex will be displayed.

 

ADDITIONAL INFORMATION

 

id124629, A-30PDA, EMP2LIC, EMP2OPT, EMP2SW, EMP3GC, EMP3LIC, EMP3OPT, EMP3SW, EMPGC, EMPGPC, EMPLIC, EMPOWER2, EMPOWER3, EMPSW, SUP, UPAPDA, UPC2PDA, UPPDA, UPPDAARC, UPPDAARCB, UPPDA-E, UPPDA-L, UPPDALTC, UPPDATC, UPPPDA

Not able to find a solution? Click here to request help.