QDa diverter valve does not switch at requested time - WKB124610
Article number: 124610
SYMPTOMS
- When requesting the diverter valve to switch in an Empower instrument method, it does not switch
ENVIRONMENT
- Empower 3
- ACQUITY QDa Mass Detector
CAUSE
Software problem
FIX or WORKAROUND
Insert a dummy SIR channel in the instrument method (for example, one that starts at 7.9 mins and stops at 8.1 mins). The valve should now switch to waste at 8 mins as requested on the instrument method events tab.
ADDITIONAL INFORMATION
id124610, EMP2LIC, EMP2OPT, EMP2SW, EMP3GC, EMP3LIC, EMP3OPT, EMP3SW, EMPGC, EMPGPC, EMPLIC, EMPOWER2, EMPOWER3, EMPSW, QDA, SUP