How do I allign the ABPR on my SFC or SFE system? - WKB82528
Article number: 82528
OBJECTIVE or GOAL
Rebuild the ABPR 20 or ABPR 200.
ENVIRONMENT
- Investigator SFC System
- SFE Bio-Botanical Extraction System
- Prep 15 SFC Purification System
- SFC Prep 15
- SFC Prep 100
- SFC 200
- SFC 350
- SFC 80
- ABPR
ADDITIONAL INFORMATION
This video uses the APBR 200 on a BioBotanical instrument for reference, but it applies to the ABPR 20 as well.
To see the ABPR alignment tool, skip to 18:40 in the video.
Outlet of ABPR needs to be disconnected and replaced with a piece of tube, the outlet of which, can be placed into the bottom of a beaker of water.

