Skip to main content
Waters

What is the heat load of a Waters system? - WKB45002

Article number: 45002

ENVIRONMENT

  • ACQUITY APC
  • ACQUITY APC Isocratic Solvent Manager
  • ACQUITY APC Sample Manager - FTN
  • ACQUITY Arc
  • ACQUITY Arc Sample Manager FTN-R
  • ACQUITY UPLC
  • ACQUITY UPLC BSM
  • ACQUITY UPLC Column Manager
  • ACQUITY UPLC H-Class
  • ACQUITY UPLC H-Class Bio
  • ACQUITY UPLC H-Class Quaternary Solvent Manager (QSM)
  • ACQUITY UPLC I-Class
  • ACQUITY UPLC H-Class PLUS
  • ACQUITY UPLC H-Class PLUS Bio
  • ACQUITY UPLC I-Class PLUS
  • ACQUITY UPLC M-Class
  • nanoACQUITY UPLC
  • PATROL UPLC Process Analysis System
  • ACQUITY UPLC Column Heater
  • ACQUITY UPLC PDA Detector
  • ACQUITY UPLC Sample Manager 
  • ACQUITY UPLC Sample Manager - Flow Through Needle PLUS (SM-FTN PLUS)
  • ACQUITY UPLC Sample Organizer
  • ACQUITY UPLC Tunable UV Detector
  • ACQUITY UPLC FLR Detector
  • ACQUITY UPLC Online SPE Man
  • 3100 Mass Detector
  • SQ Detector
  • SQ Detector 2
  • TQ Detector
  • ACQUITY TQD
  • Xevo TQ MS
  • Xevo TQD
  • Xevo TQ-GC
  • Xevo TQ-S
  • Xevo TQ-S micro
  • Xevo TQ-XS
  • BioAccord System
  • ACQUITY RDa Detector
  • SYNAPT G2-S MS/HDMS
  • SYNAPT G2-Si MS/HDMS
  • SYNAPT G2-S
  • SYNAPT G2-Si
  • Vion IMS QTof
  • Xevo QTof
  • Xevo G2 QTof
  • Xevo G2 Tof
  • Xevo G2-S
  • Xevo G2-S QTof
  • Xevo G2-S Tof
  • Xevo G2-XS
  • Xevo G2-XS QTof
  • Xevo G2-XS Tof

ANSWER

The Site Preparation Guide gives the power consumption of each module. 

Scroll down in the Site Preparation Guide to the Power Requirements section.

The summary table lists the "Typical Power Consumption". The units may be in either W (Watts) or VA (Volt-Ampere). W = VA (because the power factor is 1)

To convert from W or VA to Btu/hr: W * 3.413=Btu/hr

1 ton of refrigeration (cooling) = 12000Btu/hr

To determine total cooling requirement, calculate the heat load for each system in the lab. 

ADDITIONAL INFORMATION

If you have been assigned an Implementation Manager, they should be able to give you the Site Preparation Guide for your system. If you have not yet purchased a system or have not been assigned an Implementation Manager, please contact MS_Service@waters.com and request the guide for the module you want. 