Skip to main content
Waters

No communications with Xevo G2-XS QTof after performing building maintenance - WKB53787

Article number: 53787

SYMPTOMS

  • System powered-off for building maintenance and repairs.
  • No communications with mass spectrometer when powered back on.
  • EPC not responding error.
  • Instrument status in MassLynx: No instrument present.
  • Found: UPLC system was powered-off.

ENVIRONMENT

  • ACQUITY UPLC
  • ACQUITY UPLC H-Class
  • ACQUITY UPLC I-Class
  • Xevo G2
  • Xevo G2-S
  • Xevo G2-XS
  • SYNAPT G2
  • SYNAPT G2-S
  • SYNAPT G2-Si
  • SYNAPT XS
  • MassLynx

CAUSE

ACQUITY UPLC system was powered-off.

FIX or WORKAROUND

  1. Close MassLynx and ACQUITY MS Console.
  2. Power-off the MS if it is vented (if not vented, see additional information below).
  3. Power-on the UPLC starting with the sample manager.
  4. Once all UPLC components are powered-on, turn on the MS.
  5. Wait three minutes for instrument to initialize.
  6. Open MassLynx.

ADDITIONAL INFORMATION

Note: If the MS is not vented, ignore step 2 and restart the electronics in step 4 (see WKB822 for instructions).

Not able to find a solution? Click here to request help.