No communications with Xevo G2-XS QTof after performing building maintenance - WKB53787
Article number: 53787
SYMPTOMS
- System powered-off for building maintenance and repairs.
- No communications with mass spectrometer when powered back on.
- EPC not responding error.
- Instrument status in MassLynx: No instrument present.
- Found: UPLC system was powered-off.
ENVIRONMENT
- ACQUITY UPLC
- ACQUITY UPLC H-Class
- ACQUITY UPLC I-Class
- Xevo G2
- Xevo G2-S
- Xevo G2-XS
- SYNAPT G2
- SYNAPT G2-S
- SYNAPT G2-Si
- SYNAPT XS
- MassLynx
CAUSE
ACQUITY UPLC system was powered-off.
FIX or WORKAROUND
- Close MassLynx and ACQUITY MS Console.
- Power-off the MS if it is vented (if not vented, see additional information below).
- Power-on the UPLC starting with the sample manager.
- Once all UPLC components are powered-on, turn on the MS.
- Wait three minutes for instrument to initialize.
- Open MassLynx.
ADDITIONAL INFORMATION
Note: If the MS is not vented, ignore step 2 and restart the electronics in step 4 (see WKB822 for instructions).
id53787, comms, MALDIG2SI, SYNAPTXS, SYNG2HD, SYNG2HDMAL, SYNG2MS, SYNG2MSMAL, SYNG2SHD, SYNG2SHDML, SYNG2SIHD, SYNG2SIMS, SYNG2SMS, SYNG2SMSML, XEVOG2QTOF, XEVOG2SQTF, XEVOG2STOF, XEVOG2TOF, XEVOG2XSTF