What needs to be done with the mass spectrometer before doing preventive mainteance on the nitrogen generator? - WKB24164
Article number: 24164
ENVIRONMENT
- Xevo TQD
ANSWER
If there is a shutoff valve between the outlet of the nitrogen generator and the inlet on the back of the mass spectrometer, close this valve before powering-off the nitrogen generator. Otherwise, there is nothing that needs to be done.
ADDITIONAL INFORMATION
id24164, XEVOTQD, XEVOTQDIVD