High %RSD; system readiness test failure - WKB285652
Article number: 285652
SYMPTOMS
- System readiness test failure
- One of the injections is either high or low, causing a high RSD
- Pump leak test and syringe leak test successful
- No leaks from detector inlet or column outlet connection
ENVIRONMENT
- ACQUITY UPLC Sample Manager
- ACQUITY RI detector
CAUSE
Bad column
FIX or WORKAROUND
- Replace the column.
- Purge and prime the system.
- Equilibrate system.
- Rerun system readiness.
ADDITIONAL INFORMATION
Customer did replace the column, but test still failed. I prepared fresh mobile phase and new standard. Checked for leaks. Test failed.
Primed the syringe some more. Ran syringe leak test; test passed. Reran system readiness: test failed again.
Replaced their column with one of my existing columns used for qualification; test successful. Reran the sample set to confirm results; system readiness passed again.
id285652, A-30RI, eluent, UPARHSMFTN, UPBINARY, UPRI, UPRIARC