How to switch between Column Heater - Active (CH-A) and 30-cm Column Module (CH-30A) with no column switch box installed - WKB246608
Article number: 246608
OBJECTIVE or GOAL
Switch between Column Heater - Active (CH-A) and 30-cm Column Module (CH-30A).
ENVIRONMENT
- ACQUITY UPLC Sample Manager - Flow Through Needle PLUS (SM-FTN PLUS)
PROCEDURE
- Open the Console screen.
- Select Sample Manager FTN from the tree on the left.
- Select Column Manager Configuration from the Configure menu.
- Select Column Module in Fluidics Configuration.
- Select CH-A or CH30-A from the pull-down menu.
If you don't see the five options above, look at the rear of the sample manager and ensure that the CH-A and CH-30A interconnect cables are connected.
6. Power-off the SM-FTN.
7. Power-on the CH-30A.
8. Power-on the SM-FTN.
Note: To prevent damage to the column heater (CH-A or CH-30A), be sure to power-off the SM-FTN before connecting or disconnecting the interconnect cable.
Ensure that the SM-FTN is powered-off before connecting or disconnecting the column heater from the PSPI port.
ADDITIONAL INFORMATION
ACQUITY UPLC 30-cm Column Heater-Active Overview and Maintenance Guide
https://www.waters.com/waters/suppor...&lid=134905103
id246608, UPARHSMFTN