What is the proper order to power-on instruments in an Empower system? - WKB1507
Article number: 1507
ENVIRONMENT
- Empower, IEEE-controlled, RS-232-controlled, and ethernet-controlled instruments
ANSWER
Turn on devices in the following order:
- IEEE instruments
- RS-232 instruments
- Agilent LC/GC Ethernet systems
- Empower acquisition computer or LAC/E32 (Allow it to launch completely to the Windows desktop before the next step.)
- Ethernet instruments starting with the instrument that has the multiple network switch ports in the back.
ADDITIONAL INFORMATION
Related article "What is the proper order of reboot" WKB9476
Note: Mixing Agilent and Waters systems on the same Empower acquisition computer or LAC/E32 is not recommended.
id1507, EMP2LIC, EMP2OPT, EMP2SW, EMP3GC, EMP3LIC, EMP3OPT, EMP3SW, EMPGC, EMPGPC, EMPLIC, EMPOWER2, EMPOWER3, EMPSW, SUP