How do you confirm that an Empower project was captured by NuGenesis SDMS? - WKB74570
Article number: 74570
ENVIRONMENT
- NuGenesis 9 SDMS
- NuGenesis 8 SDMS
ANSWER
There are several methods available to verify whether a project was backed up by NuGenesis.
- Each Empower project that is captured by SDMS will have its own record in Vision. Using a filter in Vision, you can determine if an Empower project was captured by NuGenesis SDMS.
- Each Empower project that is captured by SDMS will have its own file in the NuGMillDates folder on the Empower remote box. This folder is located in Drive:\Program Files (x86)\NuGenesis 8.0\EVS\NugMillDates. You can compare the list of file names in this folder with the Project Tree in the Empower client.
- Each time that SDMS backs up an Empower project, there will be a series of entries in the Empower system audit trail. Look in the system audit trail in Empower for these events:
- Action = Toolkit
- Details = <SDMS>File Capture: Archived Project
- DBService=ServiceName
- Project=ProjectName
ADDITIONAL INFORMATION
id74570, SDMS, SDMS8, SDMS8NU, SUPISDMS, SUPNG