Empower is not calculating amounts - WKB2690
Article number: 2690
SYMPTOMS
- Amounts are not calculated
- Peak Codes Q20
- No calibration curve
ENVIRONMENT
- Empower 3 personal
CAUSE
The Calibration Standards were run with a different Instrument Method than the Unknown Sample Set.
FIX or WORKAROUND
- Rerun standards with the same Instrument Method as the unknowns.
- Process standards to build a calibration curve.
- Process unknowns against that calibration curve.
ADDITIONAL INFORMATION
