What to do when there is voltage across neutral and ground at the outlet? - WKB316236
Article number: 316236
ENVIRONMENT
- Alliance iS HPLC System
- Alliance HPLC System
- 2695 Separations Module
- 2695D Dissolution Separations Module
- 2795 Separations Module
- Alliance Series Column Heater
- Alliance Series Column Heater/Cooler
- Arc HPLC System
- ACQUITY APC
- ACQUITY APC Isocratic Solvent Manager
- ACQUITY APC Sample Manager - FTN
- ACQUITY Arc
- ACQUITY Arc Premier
- ACQUITY Arc Sample Manager FTN-R
- ACQUITY UPLC
- ACQUITY UPLC BSM (example; use other modules as needed)
- ACQUITY UPLC Column Manager
- ACQUITY UPLC H-Class
- ACQUITY UPLC H-Class Bio
- ACQUITY UPLC H-Class Quaternary Solvent Manager (QSM)
- ACQUITY UPLC I-Class
- ACQUITY UPLC H-Class PLUS
- ACQUITY UPLC H-Class PLUS Bio
- ACQUITY UPLC I-Class PLUS
- ACQUITY UPLC M-Class
- nanoACQUITY UPLC
- PATROL UPLC Process Analysis System
- ACQUITY UPLC Process Sample Manager
- ACQUITY UPLC Column Heater
- ACQUITY UPLC PDA Detector
- ACQUITY UPLC Sample Manager
- ACQUITY UPLC Sample Manager - Flow Through Needle PLUS (SM-FTN PLUS)
- ACQUITY UPLC Sample Organizer
- ACQUITY UPLC Tunable UV Detector
- ACQUITY UPLC FLR Detector
- ACQUITY UPLC RI Detector
- ACQUITY UPLC Online SPE Man
- ACQUITY Premier System
- Quattro Premier
- Quattro Premier XE
- Quattro LC
- Quattro LCZ
- Quattro micro API
- Quattro Ultima
- 3100 Mass Detector
- RADIAN ASAP Direct Mass Detector
- RenataDX Screening System
- ACQUITY QDa Mass Detector
- ACQUITY QDa II Mass Detector
- ACQUITY SQD system
- SQ Detector
- ACQUITY TQD system
- TQ Detector
- SQ Detector 2
- Xevo TQ Absolute
- Xevo TQ Absolute XR
- Xevo TQ MS
- Xevo TQD
- Xevo TQ-GC
- Xevo TQ-S
- Xevo TQ-S cronos
- Xevo TQ-S micro
- Xevo TQ-XS
- ZQ 2000
- ZQ 4000
- ZMD
- BioAccord System
- ACQUITY RDa Detector
- LCT
- LCT Premier
- LCT Premier XE
- Q-Tof Premier
- Q-Tof micro
- Q-Tof 2
- Q-Tof
- Q-Tof Ultima API
- Q-Tof Ultima Global
- SELECT SERIES Cyclic IMS
- SELECT SERIES MRT
- Synapt HDMS
- SYNAPT G2
- SYNAPT G2 MS/HDMS
- SYNAPT G2-S MS/HDMS
- SYNAPT G2-Si MS/HDMS
- SYNAPT G2-S
- SYNAPT G2-Si
- SYNAPT XS
- MALDI SYNAPT G2-Si
- Vion IMS QTof
- Xevo MRT
- Xevo QTof
- Xevo G2 QTof
- Xevo G2 Tof
- Xevo G2-S
- Xevo G2-S QTof
- Xevo G2-S Tof
- Xevo G2-XS
- Xevo G2-XS QTof
- Xevo G2-XS Tof
- Xevo G3 QTof
- SELECT SERIES MRT
ANSWER
Note: Any work on mains circuitry must only be performed by a certified electrician in accordance with local regulations.
The voltage read across neutral and ground at the outlet should not exceed 2Vac.
Properly installed electrical systems shouldn't typically ever see much higher than 2Vac between neutral and ground while under load. Having a voltage over 2Vac (especially a rising voltage) is suggestive of a problem with your electrical wiring, faulty ground, or a load imbalance at the AC Mains panel. A local electrician should look at the wiring.
ADDITIONAL INFORMATION
Having a voltage across neutral and earth in excess of 2Vac can damage the circuit boards in the instruments.