Skip to main content
Waters

How to power-on ACQUITY QDa mass detector after a prolonged shutdown - WKB97252

Article number: 97252

OBJECTIVE or GOAL

To power-on an ACQUITY QDa mass detector after a prolonged shutdown

ENVIRONMENT

  • ACQUITY QDa Mass Detector
  • Empower
  • Empower Enterprise
  • MassLynx

PROCEDURE

  1. Inspect the oil level on a performance pump.
  2. Confirm that the exhaust bottle is empty and exhaust lines are secured and not kinked.
  3. Confirm that the Stop Flow trigger is connected.
  4. Confirm that power cables, grounded Ethernet cables, and the performance pump relay box are connected properly.
  5. Confirm that the nitrogen line is connected and the supply is on.
  6. Power-on the host computer.
  7. View the following video for the remaining power-on sequences.
    • Wait until Source Pressure test completes before opening MassLynx.

 

ADDITIONAL INFORMATION

 

Not able to find a solution? Click here to request help.