Skip to main content
Waters

How to perform electronics reboot of Xevo G2 QTof - WKB230913

Article number: 230913

OBJECTIVE or GOAL

Perform electronics reboot of Xevo G2 QTof.

ENVIRONMENT

  • Xevo G2 QTof
  • UNIFI

PROCEDURE

  1. Put the Xevo G2 QTof into Pump Override using the toggle switch on rear of instrument
  2. Turn off electronics using the toggle switch on rear of instrument.
  3. Turn off external EPC.
  4. Wait five minutes.
  5. Turn on electronics using the toggle switch on rear of instrument.
  6. Wait five minutes.
  7. Turn on external EPC.
  8. Wait five minutes.
  9. Confirm that communication with the Xevo G2 QTof is re-established by checking reference sprayer beam in Manual Optimization.
  10. Take the Xevo G2 QTof out of Pump Override using the toggle switch on rear of instrument.

ADDITIONAL INFORMATION

 

Not able to find a solution? Click here to request help.