How to perform electronics reboot of Xevo G2 QTof - WKB230913
Article number: 230913
OBJECTIVE or GOAL
Perform electronics reboot of Xevo G2 QTof.
ENVIRONMENT
- Xevo G2 QTof
- UNIFI
PROCEDURE
- Put the Xevo G2 QTof into Pump Override using the toggle switch on rear of instrument
- Turn off electronics using the toggle switch on rear of instrument.
- Turn off external EPC.
- Wait five minutes.
- Turn on electronics using the toggle switch on rear of instrument.
- Wait five minutes.
- Turn on external EPC.
- Wait five minutes.
- Confirm that communication with the Xevo G2 QTof is re-established by checking reference sprayer beam in Manual Optimization.
- Take the Xevo G2 QTof out of Pump Override using the toggle switch on rear of instrument.
ADDITIONAL INFORMATION
