How do you ballast the QDa performance pump? - WKB7227
Article number: 7227
OBJECTIVE or GOAL
Ballast the performance pump.
ENVIRONMENT
- ACQUITY QDa Mass Detector
- VACUUBRAND rotary vane pump Model RE 6
PROCEDURE
- QDa should be in StandBy when ballasting occurs
- Open the manual ballast valve by turning it so that the arrow points toward the inlet of the pump (see the photo below)
- Close the ballast valve by turning so that the arrow points away from the inlet of the pump.
ADDITIONAL INFORMATION
Ballast of pump to be performed weekly
VACUUBRAND rotary vane pump: Model RE 6, part number 99139
id7227, QDA