H-Class fails SQT test injections; retention times shifted 0.5 minutes faster and peak height was 0.1 - WKB27913
Article number: 27913
SYMPTOMS
- After PM, H-Class fails SQT test injections with shifted RT and peak height of 0.1 AU
- Repeating PM does not correct the issue
- Adjusting optics and replacing flow cell on TUV does not correct issue
- Use of premixed mobile phase passes tests
- Replacing GPV does not correct the issue
- All diagnostics pass
ENVIRONMENT
- ACQUITY UPLC H-Class
- ACQUITY UPLC Tunable UV Detector
- SystemsQT
CAUSE
Wrong solvent (acetone instead of acetonitrile) was used in mobile phase.
FIX or WORKAROUND
- Remake mobile phase according to procedure.
- Rerun all testing.
ADDITIONAL INFORMATION
id27913, eluent, EMP2QLIC, EMP3Q1ULIC, EMP3QLIC, gradient proportioning valve, UPQSM, UPQSM+, UPQSMBIO, UPQSMBIO+, UPSMFTN, UPSMFTN+, UPSMFTNB+, UPSMFTNBIO