M-Class BSM defaults back to water assignment - WKB257296
Article number: 257296
SYMPTOMS
- Power cycling BSM on M-Class defaults mobile phase assignment back to water
ENVIRONMENT
- ACQUITY UPLC M-Class
CAUSE
When power cycling BSM on M-Class and running pumps manually through console or direct control, pressure is likely different than the method setting.
FIX or WORKAROUND
Load the method within the inlet method.
ADDITIONAL INFORMATION
