M-Class BSM defaults back to water assignment - WKB257296
Article number: 257296
SYMPTOMS
- Power cycling BSM on M-Class defaults mobile phase assignment back to water
ENVIRONMENT
- ACQUITY UPLC M-Class
CAUSE
When power cycling BSM on M-Class and running pumps manually through console or direct control, pressure is likely different than the method setting.
FIX or WORKAROUND
Load the method within the inlet method.
ADDITIONAL INFORMATION
id257296, eluent