How to connect ACQUITY UPLC Column Heater CM-A to ACQUITY UPLC Sample Manager SM-FTN - WKB13856
Article number: 13856
OBJECTIVE or GOAL
To connect the SM-FTN injection valve to the column select valve on the CM-A Column Manager.
ENVIRONMENT
- ACQUITY UPLC H-Class Flow Through Needle (FTN)
- ACQUITY UPLC I-Class Flow Through Needle (FTN)
PROCEDURE
- Install 700008869 - ASSY, WELDED TUBE, SS, .003 ID X 14.5 LG - to SM-FTN injector valve port 6.
- Install the other end of the tube to the central port of the Inlet Switching Valve on the CM-A Column Manager.
ADDITIONAL INFORMATION
id13856, UPIBSM, UPIBSM+, UPISMFL, UPISMFL+, UPISMFTIVD, UPISMFTN, UPISMFTN+, UPQSM, UPQSM+, UPQSMBIO, UPQSMBIO+, UPSMFTN, UPSMFTN+, UPSMFTNB+, UPSMFTNBIO