How to Calculate Peak Fronting - Tip247
OBJECTIVE or GOAL
Learn how Empower calculates cab calculate peak fronting.
ENVIRONMENT
- Empower
- Empower Tip of the Week #247
PROCEDURE
STEP 1
The definition of USP Tailing is width @5% of peak height/(2 x front half of the peak). The front half of the peak is the time from width start point at 5% of peak height to retention time and reported as f@5% (figure 1).
STEP 2:
We can calculate the back half of the peak by subtracting the front half of the peak from the width@5% (figure 2).
STEP 3
Using the USP Tailing formula, we could calculate fronting by the following: width @5% of peak height/(2 x back half of the peak) (figure 3).
STEP 4
Alternatively we could use the symmetry calculation which is back half/front half and flip that around to be front half/back half (figure 4).
STEP 5
If the value is greater than 1, the peak is fronted. Here is an example chromatogram with all the fields (figure 5).
ADDITIONAL INFORMATION
Final Note: This can be done with either the Pro or QuickStart interface.
id220500, EMP2LIC, EMP2OPT, EMP2SW, EMP3GC, EMP3LIC, EMP3OPT, EMP3SW, EMPGC, EMPGPC, EMPLIC, EMPOWER2, EMPOWER3, EMPSW, SUP