Empower 3 GC2014 (Shimadzu) "Waiting for end of run, response from GC timed out" - WKB91294
Article number: 91294
SYMPTOMS
- After completing the measurement of the first row of the sample set, it does not proceed to the second row
- The message "Waiting for end of run, response from GC timed out" appears in the message center
ENVIRONMENT
- Empower 3
- GC2014
- Sample set run time is 30 minutes
- There is no row to return to the initial temperature in the Temperature ramp program table; the last row takes 30 minutes
CAUSE
There is not enough time for the oven to return to the initial temperature.
FIX or WORKAROUND
-
For the run time of the sample set, specify the summed time of the last row of the Temperature ramp program table + the equilibration time.
-
Specify the time for returning to the initial temperature in the Next Inj. Delay of the sample set.
ADDITIONAL INFORMATION
