Skip to main content
Waters

Can System Suitability results be calculated for CE data? - WKB71671

Article number: 71671

ENVIRONMENT

  • Empower 3
  • CE and System Suitability options

ANSWER

System Suitability results can be generated in a project with the CE option turned on, assuming that the System Suitability option is also on for the project.

ADDITIONAL INFORMATION

If the CE option is turned on for a project, the Retention Time field is renamed Migration Time, but the value for the field is the same.

As long as the processing method type is LC or CE, System Suitability results will be generated.

Not able to find a solution? Click here to request help.