Can System Suitability results be calculated for CE data? - WKB71671
Article number: 71671
ENVIRONMENT
- Empower 3
- CE and System Suitability options
ANSWER
System Suitability results can be generated in a project with the CE option turned on, assuming that the System Suitability option is also on for the project.
ADDITIONAL INFORMATION
If the CE option is turned on for a project, the Retention Time field is renamed Migration Time, but the value for the field is the same.
As long as the processing method type is LC or CE, System Suitability results will be generated.
