How to add "Next Injection Delay" to an Empower report method - WKB60622
Article number: 60622
OBJECTIVE or GOAL
Add the "Next Injection Delay" field in an Empower report method.
ENVIRONMENT
- Empower (all versions)
PROCEDURE
- From the Report Method, close to open the Report Method Editor.
- From the tree on the left-hand side, double-click Sample Set Method Group to add it to the report.
- Confirm that the Sample Set Table is selected in the Sample Set Method Properties.
- Click Apply > Save.
ADDITIONAL INFORMATION
id60622, EMP2LIC, EMP2OPT, EMP2SW, EMP3GC, EMP3LIC, EMP3OPT, EMP3SW, EMPGC, EMPGPC, EMPLIC, EMPOWER2, EMPOWER3, EMPSW, SUP